What should be in a construction method statement?

Your method statement should include a few important items, such as:

  1. The project.
  2. The activity.
  3. Date of assessment.
  4. Assessor.
  5. Responsibilities.
  6. Hazards (or reference to relevant risk assessment)
  7. Work procedure and control measures. Sequence of work. Access provisions. Security and safety of others. Techniques.
  8. PPE requirements.

What is construction methodology?

Construction methodology or project execution methodology refers to the planned method of construction, taking into account all contractual and legal requirements, construction constraints, risks, and opportunities.

How do you write a method statement for a construction project?

What Do I Need to Include in My Method Statement?

  1. The name of the project and its reference.
  2. A brief summary of what the work is.
  3. Where the work is taking place (address).
  4. Start and expected completion dates for the work.
  5. The issue date and the unique document number.
  6. Details about the company carrying out the activity.
You might be interested:  Question: What Is Tender In Construction?

What is the purpose of a method statement on a construction site?

The method statement describes in a logical sequence exactly how a job is to be carried out in a way that secures health and safety and includes all the control measures. This will allow the job to be properly planned with the appropriate health and safety resources needed for it.

Who approves a method statement?

A work method statement is prepared for each task on a particular worksite, the group of work method statements are then packaged and is typically submitted at the beginning of a project for approval by the client or their representative.

What is a method statement example?

For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.

Which methodology is best for construction?

7 Popular Project Management Methodologies And What They’re Best Suited For

  1. Agile. One of the more recognizable project management methodologies, Agile is best suited for projects that are iterative and incremental.
  2. Scrum.
  3. Kanban.
  4. Lean.
  5. Waterfall.
  6. Six Sigma.
  7. PMI/PMBOK.

What are the five phases of construction?

The five phases of the construction project lifecycle are: Project Initiation and Conception.

  • Project Initiation and Conception.
  • Project Planning and Definition.
  • Project Execution and Launch.
  • Project Performance.
  • Project Close.

What are the 4 types of construction?

The four major types of construction include residential building, institutional and commercial building, specialized industrial construction, infrastructure and heavy construction.

What are the legal requirements of Method Statements?

No, not really. Although method statements don’t have a section in the regulations and are not necessarily required for every work activity, they can help you to comply with the law. Method statements can be used to plan, instruct and inform. All requirements of health and safety law.

You might be interested:  What Is Cert 3 In Civil Construction?

What are safe work method statements?

A Safe Work Method Statement ( SWMS ) is a legal document that outlines the high-risk construction work (HRCW) activities carried out within a workplace, the hazards that may arise from these activities and safety measures put in place to control the risks.

What is the difference between method of statement and procedure?

A method statement (safe system of work) is required by HASWA74 and should be written for a specific task. Procedure manuals would be written for general guidance and would probable require a method statement for specific tasks.

What is the legal requirements of a method statement on a construction site?

The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment. They detail the equipment to use during projects, and the control equipment and PPE required to keep workers and site visitors safe while tasks are ongoing.

Is a construction phase plan a method statement?

The construction phase plan is not a catalogue of risk assessments and method statements for individual tasks and activities on the project, these are separate documents that will be required under the management of health and safety by all contractors involved in the project.

How do you do a construction risk assessment?

Risk assessment for construction

  1. Identify the hazards.
  2. Decide who might be harmed and how.
  3. Evaluate the risks and decide on precautions.
  4. Record significant findings.
  5. Review the assessment and update if necessary.