What should be in a construction method statement?

Your method statement should include a few important items, such as:

  1. The project.
  2. The activity.
  3. Date of assessment.
  4. Assessor.
  5. Responsibilities.
  6. Hazards (or reference to relevant risk assessment)
  7. Work procedure and control measures. Sequence of work. Access provisions. Security and safety of others. Techniques.
  8. PPE requirements.

What is the purpose of a method statement on a construction site?

The method statement describes in a logical sequence exactly how a job is to be carried out in a way that secures health and safety and includes all the control measures. This will allow the job to be properly planned with the appropriate health and safety resources needed for it.

How do you write a method statement for a construction project?

What Do I Need to Include in My Method Statement?

  1. The name of the project and its reference.
  2. A brief summary of what the work is.
  3. Where the work is taking place (address).
  4. Start and expected completion dates for the work.
  5. The issue date and the unique document number.
  6. Details about the company carrying out the activity.
You might be interested:  Readers ask: How To Become A Construction Manager?

What is the difference between a risk assessment and a method statement?

In the simplest terms: a risk assessment analyses the risk in the workplace, whilst a method statement outlines what is being done to prevent risk.

What is a method statement example?

For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.

Who approves a method statement?

A work method statement is prepared for each task on a particular worksite, the group of work method statements are then packaged and is typically submitted at the beginning of a project for approval by the client or their representative.

What is the main purpose of a method statement?

The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment. They detail the equipment to use during projects, and the control equipment and PPE required to keep workers and site visitors safe while tasks are ongoing.

How do you write a construction risk assessment?

Risk assessment for construction

  1. Identify the hazards.
  2. Decide who might be harmed and how.
  3. Evaluate the risks and decide on precautions.
  4. Record significant findings.
  5. Review the assessment and update if necessary.

What is construction risk assessment?

Risk assessments comprise the identification of risks, the evaluation of associated risks and the determination of appropriate control measures. Many activities on a construction site are hazardous by nature and will require a full assessment of risk.

You might be interested:  What Is Prefabricated Construction?

What are the legal requirements of Method Statements?

No, not really. Although method statements don’t have a section in the regulations and are not necessarily required for every work activity, they can help you to comply with the law. Method statements can be used to plan, instruct and inform. All requirements of health and safety law.

What are safe work method statements?

A Safe Work Method Statement ( SWMS ) is a legal document that outlines the high-risk construction work (HRCW) activities carried out within a workplace, the hazards that may arise from these activities and safety measures put in place to control the risks.

What is the difference between method of statement and procedure?

A method statement (safe system of work) is required by HASWA74 and should be written for a specific task. Procedure manuals would be written for general guidance and would probable require a method statement for specific tasks.

Is a Swms a risk assessment?

An SWMS is different from a JSA. The SWMS is an overarching safety document that identifies the high- risk activities to be performed on a worksite, the hazards, and risks arising from those activities and the measures to be put in place to control the risks.

What does a risk assessment tell you?

A risk assessment is a thorough look at your workplace to identify those things, situations, processes, etc. that may cause harm, particularly to people. After identification is made, you analyze and evaluate how likely and severe the risk is.

What are method statements also known as?

Method Statements, sometimes called a ‘safe system of work’, are documents that detail the way in which tasks should be completed to adhere to safe working practices.